Adequate Transport facilities
Transport facility inside the Constituency is now enchanced to a better position by starting 7 new Kadamba Buses from Govt. of Goa for the people of my Constituency.
Seven Schools in the Constituency are provided with Balrath Buses under the Education Scheme.
Beautification of Worship Places
Renovation of St. Cruz Chapel at Ranoi Aldona.
Shed near Shri. Rashtroli Pramuj Pachayatan Devasthan at Manaswada Moira.
Construction of Mini Hall for Shri. Brahmaneshwar Devasthan on 1st floor at Coimawada Aldona.
Shade near Shri. Dev. Brahmaneshwar at Coimawada, Aldona.
Cast iron Garden Benches with Handles by GSIDC to St. Rita’s Chapel, Carona, Amadi Chapel , Carona, Aldona, Saibaba Temple, Sainagar, Aldona, Ravalghadi Temple, Nachinola.
Dramastage near Siddeshwar Devasthan at Shell V.P. Bastora along with side dressing room.
Construction of Retaining Wall and Arcada near Rashtroli Brahman Panchayatan Devasthan at Khorjuvem in Aldona.
Interlocking pavers around Shri. Rashtroli Devasthanat Pokebhat Ucassaim
Construction of store room and arcade near Sateri Mahamaya Palyekarin Devasthan at Paliem Ucassaim.
Construction of shed near the Rastroli Brahman Panchayatan Devasthan at Cuxem Corjuem
Laying flooring for hall near Zameshwar Devasthan.
Improving roads leading towards the temples, Churches and Chapels, drains nearby temples and chapels and improvements of footpaths and pathways nearby chapels.
Construction of retaining walls required near the temple and chapels.
Construction and improvement of Ganesh immersion platforms in the Constituency.
Maintenance of existing roads and providing additional roads.
Various works like hotmixing of roads, resurfing of various lanes, asphalting of roads, providing protection wall to the roads, new inter connecting roads etc. are completed in all Panchayat areas of Aldona Constituency.
Playgrounds in the constituency
Renovation of Multipurpose Indoor Stadium at Peddem along with 400 meter Athletic Track at Peddem.
Gym house at Quitla and Nachinola.
Playground at Bastora School.
Proper Electrification of all major as well as inner roads in entire Aldona Constituency.
Electrification is enhanced throughout the constituency by upgrading old Transformers, installling new Transformers across the constituency, erecting new electric poles, replacing deterioted electric poles & conductors, repairing high masks and street lights, putting new electric fixtures whereever required.
Rain Water Drainage System.
Rain water drainage system maintained by repairing existing katccha drains, covering drains with slabs wherever required, providing water drains to various roads, cleaning of the drains before monsoon throughout the Constituency.
Up-gradation of Primary Health Centre.
Up-gradation of Primary Health Centre Aldona has been commenced and will be completed by December 2016.
.
Meetings were held in all the Panchayats regarding management of Garbage issue however, Pomburpa Panchayat has already started door-to-door garbage collection, Aldona Panchayat has commenced door-t0-door dry waste collection, and Moira Panchayat has identified a place for Garbage disposal with the help of Communidade and Foundation stone has been put for protection wall & fencing for Garbage disposal.
Demand has been put to set up infrastructure so that all solid waste could be collected and transported to the Solid waste management plant at Calangute Plateau.
Names registered for the people seeking employment.
Many are helped to get job in private sectors and hotel lines.
Government of Goa employed about 180 candidates in the Constituency from 2012 till date.
For Unemployed Women
Work shop on Tailoring, embroidery classes, cooking and culinary classes, sweet making, are conducted throughout year in the constituency for unemployed women.
Display of exhibition cum sale of the articles made by the self help groups and individual are held every year in the Constituency.
Unemployment Cell at Office
An unemployed cell has been set up in the office where all CV’s are collected and registered at the office and whenever any opening is seen, the people are contacted for employment.
Vocational Training
Vocational Stream in the St. Thomas Higher Secondary is started.
Basic computer classes organized for the people.
No mega projects or skyscrapers are allowed in the Constituency and the very fabric of the Constituency is maintained with the help of the Panchayats and people of the Constituency.
Financial assistant is given to vegetable vendors who grow vegetables.
Horticulture outlets are set up to sell vegetables grown by vegetable vendors.
Farmers of Aldona Constituency avails subsidies on;
Irrigation pump
Productivity in coconut
Productivity in cashew
Fencing link
Farmers were assisted under Shetkari Aadhar Nidhi
Farmers availed assistance for seed management under the scheme crop protection in Agriculture.
Farmers availed Urban Cluster under RKVY scheme.
Farmers availed State Sector Scheme Development of Horticulture Scheme for Mango & Cashew area expansion and assistance for cultivation of coconut.
Farmer availed State Sector Scheme Development under RKVY for Oil Palm.
Farmers availed State Sector Scheme for Tribal Sub Plan (TSP)
Farmer availed 50% assistance for Hybrid Coconut Seedlings.
Farmers availed SRI incentive during Kharif and Rabi crop.
Farmers availed subsidies on Weedcutter,Power Tiller, Mini Tractor, Mini Tiller, and Sprayer.
Fertilizers were distributed to 1200 farmers in the constituency for the year 2015-16 and 1500 farmers for the year 2016-17 under Aldona MLA’s Personal Scheme.
Pathways are built in order to carry machinery to the fields.
Protection walls/Bunds are maintained to stop the salt water entering into the fields with the help of Water Resource Department and Soil Conservation Department.
Implementation of Horticulture outlets in the Constituency